So the April Showers arrived – slowed everything down so far as barn building went.
The gravel base has been delivered and the framing materials are ready to come off the trailer.
Corner posts were set and checked for square and vertical.
The rest of the posts were set for the walls. Side girts were added, then the posts trimmed off to the correct height. Top plate and top girts were added.
Half the barn to get concrete floor.
So next up is to install the trim under the eaves and around the doors. Later on I’ll add a concrete floor to remaining half and add the doors.